Follow the steps below to Assign an asset class to plant
- Click on the checkbox of the Plant
- Click on Assign to Project
- Choose the Asset Class from the Dropdown list
- Click on the checkbox to Update Costs and Charge Out Rates
- Click Assign Asset Class to save