How to create Leave Request using the Construction App (Field Users)

How to create Leave Request using the Construction App (Field Users)

This article provides a step-by-step guide on how to create a Leave Request using the Construction App 

To create a Leave Request it is essential that the staff should have the Employee Contract assigned with designated work days included
  1. Open the 3PM Construction App and sign in
  2. Select the Leave Request Form
  3. Under My Leave Request, Choose the desired date from the calendar
  4. Alternatively tap the  sign to create a new Leave Request

  5. Choose the Staff Name
  6. Select the Leave Type from the list
  7. Enter the Start date and End Date of the Leave
  8. Enable the Start Leave Half Day option if you need to take leave from the second half of the day
  9. Enable the End Leave Half Day option if you need to take leave on the first half of the day
  10. The system will automatically calculate the total Days and Hours

  11. If necessary, enter any additional comments
  12. Tap Submit to save the Leave Request