How to Create Timesheet using the Construction App (Field Users)

How to Create Timesheet using the Construction App (Field Users)

This article provides a step-by-step guide on how to create a timesheet using the Construction App 
  1. Open the 3PM Construction App and sign in.
  2. Select the Timesheet Form
  3. Under My Timesheet Choose the desired date from the calendar. Alternatively, tap the "+" sign to create a new timesheet.

  4. You need to allow The app to use your location to let you fill in the Address field by accessing location details. Select Allow while using the App option

  5. Choose the Supervisor Name from the dropdown list if required
  6. Enter the Start Date and End Date of the timesheet.
  7. Provide the Start Time and End Time for each day on the timesheet.
  8. Enter the Break Duration if applicable.
  9. If your start date and end date are not on the same day and you worked the night shift, select the Night Shift option.

  10. Select the section "Task Done" to enter the project tasks performed during the day.
  11. Choose the Project Name.
  12. Then select the Task Name.
  13. Enter the Start Time and End Time for this specific task.
  14. If any asset (plant/vehicle) was used, choose it from the provided list.
  15. The system will automatically calculate the Labor Hours and Asset Hours.
  16. Enter any necessary notes in the designated field.
  17. Select the "+" sign to create another task for the same timesheet and enter the corresponding details

  18. To submit the timesheet, select the back arrow key.
    If you need to delete a task, locate and select the trash  icon. The task list will be displayed, allowing you to choose the task you want to delete. Select the delete button to confirm
  19. Under the General Task section, you can enter any additional records not associated with a specific project.
  20. Choose the Task Name from the dropdown list and enter the Start and End Time.
  21. If necessary, you can enter job delays for a project, including the reasons for the delay.
  22. Provide comments and attach images if required.
  23. Finally, select the Submit button to submit the completed timesheet.