Integrating
Xero with 3PM Construction
Introduction
This article provides a step-by-step guide on
how to integrate Xero with 3PM Construction. Follow these instructions to
connect your Xero account and sync financial data seamlessly.
Data Flow
Here is a flow chart overview of how information flows between 3PM Construction and Xero.
- Tax Codes and Chart Of Accounts are synced from Xero to 3PM Construction
- Contacts flows both ways, if created or edited in 3PM Construction, they will be pushed to Xero. They also sync through from Xero
- Bills and Invoices currently are pushed from 3PM Construction to Xero
Prerequisites
- Valid credentials for 3PM Construction
- Valid credentials for Xero
- Two-factor authentication (2FA) enabled for Xero
Steps to
Integrate Xero with 3PM Construction
Step 1:
Access 3PM Construction
- Open your web browser and go to construction.3pm.app.
- Enter your credentials to log in to 3PM Construction.
- Upon logging in, you will be directed to the Projects page.
Step 2:
Navigate to Company Settings
- Click on the Admin tab in the side navigation bar.
- Select Company Settings from the dropdown menu.
- Scroll down to the bottom of the Company Settings page.
Step 3:
Select Xero as the Integrated Financial System
- Under Finance Settings, find the Integrated Financial System
section.
- Select Xero from the dropdown menu. This will redirect you
to the Xero login page.
Step 4: Log
in to Xero
- Enter your Xero credentials on the login page.
- If you have 2-factor authentication or multi-factor authentication setup, complete the two-factor authentication (2FA) process.
- You will be presented with the permissions grant page. Click on Allow
Access to grant the necessary permissions.
- You will be redirected back to 3PM Construction.
Step 5:
Select Your Xero Company
- Scroll down to ensure Xero is still selected.
- From the Financial System Organization dropdown menu, choose the relevant company from your Xero
account.
- If integrating payroll, note that this feature is currently in Beta
and not covered in this guide.
- Choose the master source for clients and suppliers (either Financial System (in this case would be Xero) or
3PM) based on your preference.
- Decide whether to export invoices as Draft or Approved.
Step 7:
Save and Sync
- Select the Demo Company NZ (or your relevant company) and click Save.
- The syncing process for tax rates and accounts will begin. This
process can take anywhere from 5 to 10 minutes depending on the schedule
queue.
Step 8:
Verify Sync Completion
- After receiving the notification, click on Tax Rates to
confirm that the tax rates have been imported from Xero.
- Similarly, check the Accounts to ensure the
accounts have been successfully imported.
Conclusion
By following these steps, you will have
successfully integrated Xero with 3PM Construction. This integration will help
streamline your financial management by syncing tax rates and chart of accounts
between the two systems.
For further assistance, please contact our
support team.
Introduction
This article provides a step-by-step guide on
how to sync contacts, including clients and suppliers, from Xero to 3PM
Construction. Follow these instructions to ensure your contacts are updated
seamlessly between the two systems.
Prerequisites
- Valid credentials for 3PM Construction
- Valid credentials for Xero
Step 1:
Access the Clients Page
- Log in to 3PM Construction using your credentials.
- Navigate to the Sales tab in the side navigation bar.
- Select Clients from the dropdown menu.
Step 2:
Sync Clients and Suppliers
- Click on the Sync Xero button on the Clients page. This
action initiates the sync process for both clients and suppliers.
- Alternatively, you can go to the Purchasing tab, select Suppliers,
and click Sync Xero from there. Either method will sync both
clients and suppliers.
Step 3:
Wait for the Sync to Complete
- The syncing process will take a few minutes to update. The duration
may vary depending on the size of your client and supplier lists.
- Once the sync is complete, you will have your clients imported from
Xero.
- After the sync is complete, check the Clients page under Sales to
see the imported clients.
- To verify the imported suppliers, go to the Purchasing tab and
select Suppliers.
Conclusion
By following these steps, you will have
successfully synced your contacts, including clients and suppliers, from Xero
to 3PM Construction. This integration ensures that your contact lists are
always up-to-date and helps streamline your business processes.
For further assistance, please contact our
support team.
Creating
and Updating Clients and Suppliers in 3PM Construction with Xero Integration
Introduction
This article provides a step-by-step guide on
how to create and update clients and suppliers in 3PM Construction when
integrated with Xero. Depending on your settings, either Xero or 3PM
Construction can be the master of client and supplier details.
Prerequisites
- Valid credentials for 3PM Construction
- Valid credentials for Xero
- Xero integration enabled in 3PM Construction
Steps to
Create and Update Clients and Suppliers
Scenario 1:
Xero as the Master of Clients and Suppliers
Step 1:
Access the Clients Page
- Log in to 3PM Construction using your credentials.
- Navigate to the Sales tab in the side navigation bar.
- Select Clients from the dropdown menu.
Step 2:
Attempt to Edit Client Details
- Select an existing client to edit (right click > select Edit).
- You will notice that most details are not editable. This is because
Xero controls these details when it is set as the master of clients and
suppliers.
Step 3:
Create a New Client
- Click on Add New Client, alternatively the button situated on the table's top right hand corner.
- Enter the client details. All fields are accessible at this stage.
- Click Submit to save the new client.
- After syncing with Xero, these details will become non-editable in
3PM Construction.
Step 4:
Verify in Xero
- Log in to Xero.
- Navigate to All Contacts to find the newly created client.
- Since there are no invoices against this contact yet, it will be
listed as a contact with the details sent from 3PM Construction.
Scenario 2:
3PM Construction as the Master of Clients and Suppliers
Step 1:
Change Master Setting
- Go to Admin > Company Settings.
- Scroll down to the Finance Settings section.
- Select 3PM as the master of clients and suppliers.
- Click Save.
Step 2:
Edit Existing Client Details
- Go back to the Sales tab and select Clients.
- Choose an existing client (e.g., default client created during the
initial sync).
- You will notice that the fields are now open for editing.
- Edit the necessary details, such as the client name or office
address.
- Click Submit to save the changes.
Step 3:
Verify in Xero
- Log in to Xero.
- Look for the edited client (e.g., Bayside Club) in All Contacts.
- Verify that the changes, such as the name and office address, have
been updated in Xero.
Step 4: For Suppliers
- Follow the same steps for creating and updating suppliers under the
Purchasing tab.
- The process is identical to that for Clients.
Conclusion
By following these steps, you can effectively
create and update clients and suppliers in 3PM Construction with Xero
integration. Depending on your settings, you can control where the master data
resides, either in Xero or 3PM Construction.
For further assistance, please contact our
support team.
How to
Post Invoices and Bills to Xero
Introduction
This article provides a step-by-step guide on
creating invoices and bills and posting them to Xero. Follow the instructions
below to streamline your invoicing and billing process using Xero.
Creating an
Invoice
Navigate to Sales and Invoices:
Approval Process:
- Depending on your invoice settings, invoices may require approval before being posted
to Xero.
- Approve the invoice to push it to Xero.
- Once approved, the Xero-generated invoice number will appear under
the invoice number column.
- The Xero-generated ID (Financial System UID) is also stored in the invoice details.
Verify in Xero:
- Go to Xero and navigate to Accounting > Business >
Invoices.
- Confirm that the invoice appears with the correct reference, date,
amount, and line items.
Creating a
Bill
Navigate to Purchasing and Bills:
- Go to the Purchasing section.
- Click on Bills.
- For existing bills, move on to step 2, otherwise see How to Create Bills
Approval Process:
- Similar to invoices, bills may require approval before being
posted to Xero.
- Approve the bill to push it to Xero.
- The Xero-generated ID will be stored in the bill details under the
internal use section.
Verify in Xero:
- Go to Xero and navigate to Accounting > Business > Bills.
- Confirm that the bill appears with the correct details and line
items.
Conclusion
By following these steps, you can efficiently
create and post invoices and bills to Xero. Ensure that all necessary approvals
are completed to maintain accurate records in your accounting system. Thank you
for following this guide.
For more detailed information, refer to the
official Xero documentation or contact your system administrator.
How to
Disconnect an Existing Xero Integration via 3PM Construction
Introduction
This article provides a step-by-step guide on
how to disconnect an existing Xero integration that was initiated through 3PM
Construction. Follow the instructions below to effectively manage your
integration connections.
Steps to
Disconnect Xero Integration
Access Company Settings:
- Navigate to the Company Settings page in 3PM Construction.
Go to Manage Connections:
- Ensure you are on the Company Settings page.
- Click on the Manage Connections tab.
View Active Integrations:
- The Manage Connections tab displays all your current and past
integrations.
- Locate the active integration you want to disconnect. For example,
the demo company and its associated account.
Verify Connection in Xero:
- Open Xero and navigate to Settings > Connected Apps.
- Confirm that the 3PM Construction is listed under connected apps.
Remove the Connection via 3PM Construction:
- Go back to the Manage Connections tab in 3PM Construction.
- Click on Remove Connection.
- Confirm the removal by clicking Yes.
Verify Disconnection in Xero:
- Return to Xero and refresh the Connected Apps page.
- Ensure that the 3PM Connector is no longer listed, indicating a
successful disconnection.
Conclusion
By following these steps, you can easily
disconnect an existing Xero integration via 3PM Construction. This process
ensures that your integrations are properly managed and updated. For further
assistance, refer to the official documentation or contact your system
administrator. Thank you for following this guide.