How to Override Project Number

How to Override Project Number

Follow the steps below to Override Project Number

The Project Number can be configured from Project Setting Page with Project Prefix and Pad with Zeros functionality. 
  1. Navigate to the Web Portal and login
  2. On the left-hand main menu, select Projects-> Projects
  3. ☑️ Tick mark the project checkbox from the Project list



  4. Click on Override Project Number


The override Project Number option will override the numbering sequence and replace the Project Number with the Internal Project Number. This procedure is not reversible



    • Related Articles

    • How to Override Staff Number

      This article will help you to Override Staff Number Navigate to the Web Portal and login On the left-hand main menu, select Staff->Staff Click on the Staff checkbox, multiple staff can be selected as well Click on Override Staff Number The override ...
    • How to Override Plant Asset Number

      This article will explain How to Override Plant Asset Number Navigate to the Web Portal and login On the left-hand main menu, select Assets->Plant Click on the checkbox of the vehicle Click on Override Plant Asset Number Note: This process will ...
    • How to Override Vehicle Asset Number

      This article will explain How to Override Vehicle Asset Number Navigate to the Web Portal and login On the left-hand main menu, select Assets->Vechicle Click on the checkbox of the vehicle Click on Override Vehicle Asset Number Note: This process ...
    • How to add Project Tasks

    • How to Setup Project Settings

      Please follow the steps below to configure Project Settings and save default values for a project. This will enable you to establish default configuration values for your project Navigate to the Web Portal and login On the left-hand main menu, select ...